Tuesday, September 25, 2012


Plan to power Darwin with tidal energy gains momentum

by Sophie Vorrath

A plan to power Darwin with tidal energy – and to turn the Northern Territory into a tropical tidal energy hub – has come one step closer to being realised this week, after the signing of an MoU to build a 2MW pilot plant and research centre in Clarence Strait, off the Territory's coast.
Australian tidal energy company Tenax Energy said on Tuesday it had signed a Memorandum of Understanding with the NT's Power and Water Corporation to develop a 2MW Pilot Plant and Research and Tropical Tidal Testing Centre, the first steps on the path to a utility-scale generation facility that would deliver renewable power to Darwin.
Tenax says the project – to be located between Darwin and Melville Island – will be generating electricity by 2015, and could reach commercial scale before the end of the decade. The 2MW project will be followed by a 10MW pilot array test.
The Darwin-based company was first given a provisional licence to occupy 16.8sqkm in the Clarence Strait in 2010, having identified the area as one of three locations around Australia ideally suited to tidal energy; with high tidal velocity movement, sufficient water depth, and proximity to existing power grid infrastructure. (The other two locations are Banks Strait, Tasmania, and Port Phillip Heads, Victoria.)

No comments:

Post a Comment